View All / Case Study
Midwest Materials
Saved $454k in a single year with Limble
Roarke Baldwin
Process Improvement Engineer
Find out how Limble helped Midwest Materials streamline purchasing and create an infrastructure for their transition to preventive maintenance.
Download this Case Study to view the results:Here’s what happened when Midwest Materials started using Limble:
- A 452% annual ROI.
- 80% reduction in overtime costs.
- Now have a 78% reduction in PO processing time.