View All / Case Study

Midwest Materials

Saved $454k in a single year with Limble

Roarke Baldwin Process Improvement Engineer

Find out how Limble helped Midwest Materials streamline purchasing and create an infrastructure for their transition to preventive maintenance.

Download this Case Study to view the results:

Here’s what happened when Midwest Materials started using Limble:

  • A 452% annual ROI.
  • 80% reduction in overtime costs.
  • Now have a 78% reduction in PO processing time.
Midwest Materials Case Study