Work Inspection Requests: Your Guide to Effective Quality Control

Work Inspection Requests (WIR) are crucial tools for upholding the integrity and safety of your construction projects. These requests function as a way for stakeholders to evaluate work in alignment with predetermined standards and specifications. When you understand just how important WIRs can be and how they work, it lets you and your team improve resource allocation, avoid rework, and boost efficiency all around. 

What is a Work Inspection Request? 

A Work Inspection Request is a formal document submitted by a contractor to initiate inspections of completed construction projects. The primary objective is to ensure that the work complies with specified standards, building codes, and quality criteria. This request triggers an in-depth inspection conducted by the project’s quality control team, which typically includes the project manager as well as QA/QC engineers.

WIRs aren’t the same thing as different quality control processes that companies use, like Material Inspection Requests (MIRs) or Requests for Information (RFIs). With an MIR you’re attempting to verify the quality of your materials before you use them on the job site, while RFIs generally attempt to sort out any discrepancies in the project documents. Work Inspection Requests only address the quality of the work after it’s been completed. 

WIRs are crucial to the overall success of a company’s construction projects. They are critical checkpoints that:

  1. Verify the quality of the work performed
  2. Ensure compliance with building codes and regulations
  3. Identify and address any deficiencies or ways the work didn’t match specifications

When construction professionals undergo the rigorous WIR process, they’re doing more than just maintaining the overall quality of the project and the safety of the worksite. They’re also creating a clear record of the inspection results which may be invaluable for addressing disputes, tracking progress, and proving compliance. 

What should you include in your Work Inspection Requests? 

For the WIR to go as smoothly and effectively as possible, it should have all of the information required by the quality control team. A WIR template that’s done right should have certain key features that streamline the construction process and make communication easier, such as: 

  1. Project and inspection details, such as the project name, location, date and time, and permit number
  2. The items that will be inspected, with a clear description of the scope of work and specific areas or elements that need attention 
  3. Context about relevant specifications of the project and guidance for the inspection,  including an Inspection and Test Plan (ITP)
  4. A comprehensive checklist of inspection criteria to make sure teams evaluate everything required
  5. Enough room for technicians to make note of inspection results and next steps
  6. Space for managers to formally sign off on finished work

Because few construction projects have the same requirements, it helps to customize your WIR forms using a form builder. This lets project managers and QA/QC engineers tailor their own WIR template to the needs of the project so they can capture and communicate the right information effectively. 

Don’t underestimate the importance of keeping clear and complete WIR documents, as it improves transparency, accountability, and traceability in the construction process. The proper documentation helps you track the progress of your construction work, identify trends, and make better data-driven decisions for a more efficient operation all around.

Essential steps in a Work Inspection Request workflow

For the WIR process to flow smoothly, construction teams must follow a systematic process that includes people from different departments and companies. Adhering to these essential steps keeps efficiency high, prevents delays, and creates a greater connection between team members

1. Site Engineer or Project Engineer prepares the WIR

The WIR workflow starts when the Site Engineer or Project Engineer completes the WIR paperwork. They’ve already done the actual construction work at this point and have reviewed it to see if it meets their standards and specifications. They next fill out the WIR document with information about the project to be inspected, as well as relevant drawings and other details attached. 

2. Engineer reviews and submits the document

Once the document is ready, the QA/QC Engineer reviews it to ensure it’s accurate and complete. They confirm that all the required info is included and that the WIR adheres to the project’s quality management plan. Engineers collaborate with the Site Engineer or Project Engineer if any revisions are needed. After approval, the engineers hand over the WIR to the team member responsible for handling documents like these, the Document Controller.

3. Document Controller sends the WIR to a third party

The main contractor’s Document Controller is highly important in the overall workflow. They get the completed WIR from the engineer and ensure it’s properly logged and tracked in their system. Then, they send it to a third party who’ll ensure the construction work meets all specifications. The Document Controller typically sends the WIR to the consultant’s Document Controller for review and approval.

4. Consultant/third party records and reviews the WIR 

The consultant’s Document Controller receives the WIR and records it in their system, starting their review process. They distribute the WIR to their team members for evaluation, which may include their manager or lead engineer. The consultant team assesses the WIR, checking to see if the work meets the required specifications. 

5. Contractor gets back the WIR

Once the consultant team has reviewed the WIR, they return it to the main contractor’s Document Controller. The Document Controller updates the system with the WIR’s status (e.g., approved, approved with comments, or revise and resubmit) and sends it out to team members, including the Site Engineer, Project Engineer, and QA/QC Engineer.

6. Contractor takes action based on WIR status

Now team members learn what they need to do based on the third party’s evaluation of the construction work. If the WIR is approved, the contractor can move forward with the next phase of the project. If the consultant approves the WIR with comments, then the contractor needs to address the issues while going forward.

In the case of a “revise and resubmit” status, the Site Engineer or Project Engineer will need to make the requested adjustments and then resubmit the WIR for another review cycle. Typically they send the revised document back over to the QA/QC Engineer and it makes the same journey through the steps as before until finally obtaining the consultant’s approval. 

Following these steps can help teams improve their processes, reduce delays, and produce quality work. Effective communication among all parties is crucial for completing construction projects on time.

Work Inspection Requests: driving innovation and excellence in construction

Work Inspection Requests play an undeniable role in ensuring quality, safety, and compliance in construction work. By promoting a culture of ongoing improvement and empowering teams to enhance their WIR procedures, you can foster innovation and excellence in the field. Leveraging technology like mobile inspection apps and automated workflows can further streamline the WIR process, enabling teams to surpass client expectations and establish new standards of excellence.